What should I pay attention to during the installation of Mold Waterway Water Isolation Sheet?

Publish Time: 2024-07-02
During the installation of Mold Waterway Water Isolation Sheet, in order to ensure that it is installed correctly and exerts the cooling effect it should, you need to pay attention to the following key points:

Preliminary preparation and inspection

1. Check the specifications and models:

Before installation, first check whether the specifications and models of the water isolation sheet match the mold design requirements. This includes the size, material, thread specifications, etc. of the water isolation sheet, and then install it after ensuring that they are correct.

2. Check the mold waterway:

Clean the impurities and dirt in the mold waterway to ensure that the waterway is unobstructed. Check whether the waterway aperture, depth, etc. meet the design requirements so that the water isolation sheet can be installed smoothly and sealed well.

Installation steps and operating specifications

1. Positioning and fixing:

Place the water isolation sheet accurately at the specified position of the mold waterway. For threaded water isolation sheets, use a suitable tool to tighten the bottom thread until the specified tightening torque is reached to avoid leakage or damage caused by overtightening or overloosening.

2. Sealing check:

After installation, a sealing check should be performed. You can use methods such as air pressure test or water pressure test to check whether the seal between the water barrier and the mold water channel is tight to ensure that there is no leakage.

3. Follow the operating specifications:

During the installation process, follow the operating specifications and safety requirements. For example, do not use hoses or joints with cracks to prevent leakage or falling off; do not excessively rotate, twist, vibrate and apply pressure on the joints to avoid damaging the joints and causing product failure, leakage or malfunction.

Precautions and details

1. Precautions for threaded installation:

For threaded installation water barriers, be careful not to exceed the tightening torque during installation to prevent damage. At the same time, you can apply an appropriate amount of lubricant to the threads before installation to reduce friction and wear.

2. Material and corrosion resistance:

Choose the appropriate water barrier material according to the different working environments of the mold. For example, in a highly corrosive environment, a brass water barrier with good corrosion resistance should be selected.

3. Cooling effect and layout:

The installation layout of the water isolation sheet should be reasonable to ensure that the mold waterway can form an effective cooling cycle. At the same time, pay attention to the minimum margin requirement of the waterway from the core to avoid affecting the cooling effect or causing processing errors.

4. Subsequent maintenance and care:

After installation, the mold waterway and water isolation sheet should be regularly maintained and serviced. Clean dirt, check sealing, replace damaged water isolation sheets, etc. to ensure the normal operation of the mold and extend its service life.

In summary, the installation process of Mold Waterway Water Isolation Sheet requires meticulous, rigorous and standardized. Only by ensuring that each step is correct can the cooling effect of the water isolation sheet be fully utilized to ensure the normal operation of the mold and product quality.
×